“I’ve got a client A, B and C they all want me to do work at the same time. They all want to use materials that I’m not even sure that I can get my hands on them. And when I do get my hands on them, actually, I’m not sure what the price of those materials are going to be. I’m going to need three different crews to work on the three different projects and I’m not sure if I can even get two crews never mind three crews. It’s a challenge there’s no doubt about it, you know.”
Peter Finn a.k.a. Pete The Builder